Main station|Member Center|Save the desktop|Mobile browsing
Ordinary Member

Usenko Consulting (Dalian) Co., Ltd.

Environmental impact assessment report, energy saving assessment report

sell
  • There is no classification
contact
  • Contact:王先生
  • Phone:0411-84802090
search
 
link
  • There is no link yet
home > sell > Anshan Energy Assessment
Anshan Energy Assessment
products: Views:3Anshan Energy Assessment 
brand: 优森柯咨询(大连)有限公司
price: 面议
MOQ:
Total supply:
Delivery date: Shipped within 3 days from the date of payment by the buyer
Valid until: 2017-10-25 [Expired]
Last updated: 2016-11-22 15:10
Details
& Anshan Energy Assessment
Yousenko Consulting (Dalian) Co., Ltd.
National Development and Reform Commission Engineering Consulting Grade A Qualified Unit Energy Saving Assessment Consulting Grade A Qualified Unit Environmental Assessment Consulting Grade A Qualified Unit
Planning Consulting Grade A Qualification Unit Assessment and Consultation Class A Qualification Unit
National regional contact number
Dalian area contact number
Anshan Neng Appraisal
Anshan Neng Appraisal Fee
Anshan Neng Appraisal Qualification
Anshan Energy Assessment Company
Anshan Energy Assessment Unit
Anshan Energy Assessment Professional Institution
6. Evaluation of energy-saving measures
(1) Energy-saving measures
Energy-saving technical measures. Energy-saving technical measures in production technology, power, construction, water supply and drainage, HVAC and air conditioning, lighting, control, electrical, etc., including new energy-saving technologies, new processes, new equipment applications, waste heat, residual pressure, combustible gas recycling, construction Envelope structure and thermal insulation measures, comprehensive utilization of resources, utilization of new and renewable energy, etc.
, Energy saving management measures. Energy conservation management systems and measures, energy management institutions and staffing, energy statistics, monitoring and measuring instrument configuration, etc.
(2) Single energy-saving projects
For energy-saving projects that are not included in the leading process flow of the construction project and are planned to be constructed in phases, a detailed discussion of the process flow, equipment selection, single project energy saving calculation, unit energy saving investment, and investment Estimation and investment payback period, etc.
(3) Evaluation of the effects of energy-saving measures
Calculation of energy-saving measures, energy consumption per unit product (building area), energy consumption per main process (art), energy consumption per unit investment and other indicators, international and domestic comparative analysis, design Whether the indicators reach the domestic advanced level or the international advanced level in the same industry.
(4) Economic evaluation of energy-saving measures
Calculation and evaluation of the costs and economic benefits of energy-saving technologies and management measures.
7. Existing problems and suggestions
8. Conclusion
9. Attached drawings and schedules
List of main energy-consuming equipment in the factory (field) area general plan and workshop process floor plan Main energy and energy-consuming working fluid types and annual demand table, energy balance table, etc.
Anshan Energy Assessment
Anshan Energy Assessment Fees
Anshan Energy Assessment Grid
Anshan Energy Assessment Company
Anshan Energy Assessment Unit
Anshan Energy Assessment Professional Organization
/>
A total of0articles  Related Comments: